EAST END REGIONALIZATION PROJECT

Below is a link to the Special Study as required by the Pennsylvania Department of Environmental Protection (DEP) for the East End Regionalization Project (Plan). This Plan proposes demolition of the existing Potts Grove Wastewater Treatment Plant (WWTP) and installation of a pump station to pump Potts Grove flow to the existing MRSA WWTP. Additionally, the Plan proposes gravity connection for residential homes within the Mahoning Manor and Boiardi Lane/Pleasant Valley Village areas of Turbot Township.

Potts-Grove-Turbot-Twp-Special-Study-for-Planning-Public-Comment_Optimized.pdf

Sludge Handling Optimization Project

Below is a link to the Special Study as requested by the Pennsylvania Department of Environmental Protection (DEP) for a Sludge Handling Optimization Project (Project) at their Wastewater Treatment Plant (WWTP). This Project is proposed to improve the Authority’s current sludge handling facilities through the elimination of outdated and/or non-functional equipment, thus addressing ongoing operation and maintenance issues.

2018.11.02 Public Comment Period Version of MRSA Sludge Optimization Special Study